Skip to main content
Rate this vehicle: 
0
No votes yet
Build Details
February 12, 2008

This is my 1979 CJ-5 running a 304 and T150 3spd. I installed a 4" suspension lift, 33x12.5 mud tires rebuilt tub with tool box, roll-on bed-liner, and much more miscellaneous. My plans are to upgrade the drive train, add a winch, lockers, and after that probably find something else to upgrade. Thanks to Quadratec and your great parts selection and service. A good project never ends.